We set up a by pass pump system and kept the entire hotel open including all rooms , restaurants, and two bars open while the repair was made. There was also 3 houses on this same line that we kept in service during the repair.
The problem: Cracked and broken 8″ cast iron sewer line under two of the detached 3,000 squares foot guest quarters on the hotel grounds
The solution: Complete sewer by pass (manhole to manhole )
Then repair & reline the pipe system.
Quote from head engineer after we worked straight thru till 9 30 PM to get the job done
“Thanks Chris. You guys kicked ass today”